RE: 2" leveling kit
I lowered the back 1½" as well. This takes less than an hour to do. Lifting the front end is an all day project.
__________________
05 DAK CC 4X4 SLT 4.7L, 26E pak, 5 speed auto, 17" acc wheel, nerf bar, tinted, front tow hooks, tow receiver, alumium gas cover, spray bed liner, K&N filter,180 stat, Magnaflow muffler, leveling shackles,etc, etc
|